Two new sections, a part of Metro Line 9 and Line 2B, might be inaugurated by December 31, in response to Hindustan Instances, citing the Mumbai Metropolitan Area Improvement Authority (MMRDA) officers. The 2 corridors might be Line 9 and Line 2B.
Two new metro corridors a part of Mumbai Metro will open December finish.
In a serious enlargement of Mumbai’s metro community, two new sections, a part of Metro Line 9 and Line 2B, might be inaugurated by December 31, in response to Hindustan Instances, citing the Mumbai Metropolitan Area Improvement Authority (MMRDA) officers. The 2 corridors might be Line 9, connecting Dahisar East and Kashigaon, and Line 2B, connecting Diamond Backyard in Chembur and Mandale in Mankhurd. The enlargement of the metro strains will present a a lot wanted reduction to Mumbaikars and adjoining areas.
Thes new corridors can even assist in easing stress and scale back journey instances for day by day commuters. In line with the Hindustan Instances report, the 2 corridors which can quickly be inaugurated are a part of the preliminary part of their respective corridors.
Final month, Maharashtra Transport Minister Pratap Sarnaik introduced that the Metro line between Dahisar and Kashimira, positioned on Line 7, is prone to be operational by December finish. Prime Minister Narendra Modi will seemingly inaugurate the 2 strains, in response to the report.
Metro Line 9 is an extension of Line 7 and is a 13.58-km elevated route designed to enhance connectivity between Dahisar East and Mira-Bhayandar. Moreover, Line 2B which connects DN Nagar to Mandale is underneath development in phases. Trial runs are at present in progress on the 5.3-km first-phase section between Mandale and Diamond Backyard in Chembur.
Keep forward of the curve with NextBusiness 24. Discover extra tales, subscribe to our e-newsletter, and be part of our rising group at nextbusiness24.com

